• Pset_ProjectOrderMaintenanceWorkOrder


    Pset_ProjectOrderMaintenanceWorkOrder

    项目订单维护工作订单:维护工作订单是对要执行的维护工作的详细描述。请注意,当需要维护工单作为计划工单实例时,将使用维护工单的计划频率属性。

    NameTypeDescription
    ProductDescription P_SINGLEVALUE / IfcText
    Product Description A textual description of the products that require the work.
    WorkTypeRequested P_SINGLEVALUE / IfcText
    Work Type Requested Work type requested in circumstances where there are categorizations of types of work task. It could be used to identify a remedial task, minor work task, electrical task etc.
    ContractualType P_SINGLEVALUE / IfcText
    Contractual Type The contractual type of the work.
    IfNotAccomplished P_SINGLEVALUE / IfcText
    If Not Accomplished Comments if the job is not accomplished.
    MaintenaceType P_ENUMERATEDVALUE / IfcLabel / PEnum_MaintenanceType
    Maintenace Type Identifies the predefined types of maintenance that can be done from which the type that generates the maintenance work order may be set where: ConditionBased: generated as a result of the condition of an asset or artefact being less than a determined value. Corrective: generated as a result of an immediate and urgent need for maintenance action. PlannedCorrective: generated as a result of immediate corrective action being needed but with sufficient time available for the work order to be included in maintenance planning. Scheduled: generated as a result of a fixed, periodic maintenance requirement.
    FaultPriorityType P_ENUMERATEDVALUE / IfcLabel / PEnum_PriorityType
    Fault Priority Type Identifies the predefined types of priority that can be assigned from which the type may be set where: High: action is required urgently. Medium: action can occur within a reasonable period of time. Low: action can occur when convenient.
    LocationPriorityType P_ENUMERATEDVALUE / IfcLabel / PEnum_PriorityType
    Location Priority Type Identifies the predefined types of priority that can be assigned from which the type may be set where: High: action is required urgently. Medium: action can occur within a reasonable period of time. Low: action can occur when convenient.
    ScheduledFrequency P_SINGLEVALUE / IfcTimeMeasure
    Scheduled Frequency The period of time between expected instantiations of a work order that may have been predefined.

    ##############################

  • 相关阅读:
    ZOJ
    FZU
    FZU 2231 平行四边形数
    [转载] java的动态代理机制详解
    [转载] 解读ClassLoader
    [转载] 深入了解Java ClassLoader、Bytecode 、ASM、cglib
    MyBatis入门
    Spring入门
    Nginx入门
    Redis入门
  • 原文地址:https://www.cnblogs.com/herd/p/15778387.html
Copyright © 2020-2023  润新知