• HDOJ1050


    Moving Tables

    Time Limit: 2000/1000 MS (Java/Others)    Memory Limit: 65536/32768 K (Java/Others)
    Total Submission(s): 16129    Accepted Submission(s): 5542


    Problem Description
    The famous ACM (Advanced Computer Maker) Company has rented a floor of a building whose shape is in the following figure. 



    The floor has 200 rooms each on the north side and south side along the corridor. Recently the Company made a plan to reform its system. The reform includes moving a lot of tables between rooms. Because the corridor is narrow and all the tables are big, only one table can pass through the corridor. Some plan is needed to make the moving efficient. The manager figured out the following plan: Moving a table from a room to another room can be done within 10 minutes. When moving a table from room i to room j, the part of the corridor between the front of room i and the front of room j is used. So, during each 10 minutes, several moving between two rooms not sharing the same part of the corridor will be done simultaneously. To make it clear the manager illustrated the possible cases and impossible cases of simultaneous moving. 



    For each room, at most one table will be either moved in or moved out. Now, the manager seeks out a method to minimize the time to move all the tables. Your job is to write a program to solve the manager’s problem.
     

    Input
    The input consists of T test cases. The number of test cases ) (T is given in the first line of the input. Each test case begins with a line containing an integer N , 1<=N<=200 , that represents the number of tables to move. Each of the following N lines contains two positive integers s and t, representing that a table is to move from room number s to room number t (each room number appears at most once in the N lines). From the N+3-rd line, the remaining test cases are listed in the same manner as above.
     

    Output
    The output should contain the minimum time in minutes to complete the moving, one per line.
     

    Sample Input
    3 4 10 20 30 40 50 60 70 80 2 1 3 2 200 3 10 100 20 80 30 50
     

    Sample Output
    10 20 30
     

    Source

    这道题目很有意思!所以拿上来了!

    贴代码说明自己太懒了!

    别人的思路!

    其实重合线段最多的一部分就是答案!这个仔细想想!

    因为重合多的地方一定要分开弄!

    注意:房间一侧都是隔着1个数!

    所以还要预处理下!

    主要代码:  

       if (x>y) swap(x,y);
            int xx,yy;
            if (x%2==1) xx=(x-1)/2+1;
            else xx=x/2;
            if (y%2==1) yy=(y-1)/2+1;
            else yy=y/2;
            for (int j=xx;j<=yy;j++)
            f[j]++;
           }
    随性Code
  • 相关阅读:
    [Swift-2019力扣杯春季初赛]2. 校园自行车分配
    php 遇到报错 Call to a member function fetch_object()
    Proactive Patching Overview
    PHP 官方说明
    SecureCRT 迁移到新环境,导出配置文件目录 转
    ORA-00020: maximum number of processes (300) exceeded
    转 SQL*PLUS中的替换变量(& &&)
    转 DOS(CMD)下批处理换行问题/命令行参数换行 arg ms-dos
    php 报错如下:Notice: Trying to get property of non-object
    mysqli 进一步分析
  • 原文地址:https://www.cnblogs.com/forgot93/p/3451890.html
Copyright © 2020-2023  润新知