• 【MM MRP】PA-Unite3 Forecast(MRP_3)


    1.Basics of the Forecast

    1.1 The historical consumption values exist for the material.In addtion,you can enter historical consumption values manually as basic values for the first forecast.Also can refer to the consumptiona values of another marterial if this is no historical data for the material.

    1.2 To execute the individual forecast, go to the SAP Easy Access menu and choose:Logistics → Materials Management → Material Requirements Planning (MRP)
    → Materials Forecast → Forecast → Individual Forecast → Execute (MP30).

    1.3 To execute a forecast for an entire plant, go to the SAP Easy Access menu and choose: Logistics → Materials Management → Material Requirements Planning
    (MRP) → Materials Forecast → Forecast → Total Forecast. You can choose. between the total forecast online (MP38) or in background processing (MPBT). To avoid overloading the system, carry out the total forecast in background mode.

    2.Postprocessing of the Forecast Results

    2.1 Print list check

    choose: Logistics → Materials Management → Material Requirements Planning (MRP) → Materials Forecast → Forecast → Total Forecast→ Print (MP39).

    To print as a background job, go to the SAP Easy Access menu and  choose: Logistics → Materials Management → Material Requirements  Planning (MRP) → Materials Forecast → Forecast → Total Forecast →Print (Background) (MPDR).

  • 相关阅读:
    零是奇数还是偶数?
    解决TortoiseSVN中out of date问题的一个方法
    squid透明代理+iptables防火墙,多网卡详细配置
    基于协同过滤的推荐方法
    IP分片和TCP分片 MTU和MSS(转)
    Google Protocol Buffer 的使用和原理(转)
    到底多少线程算是线程数太多?
    开源软件53个相关概念
    GPL,LGPL和BSD等协议注意事项
    IEEE 802
  • 原文地址:https://www.cnblogs.com/potatoo/p/7521620.html
Copyright © 2020-2023  润新知