• OCP-1Z0-053-V13.02-1题


    1.While deploying a new application module, the software vendor ships the application software along

    with appropriate SQL plan baselines for the new SQLs being introduced. Which two statements describe

    the consequences? (Choose two.)

    A. The plan baselines can be evolved over time to produce better performance.

    B. The newly generated plans are directly placed into the SQL plan baseline without being verified.

    C. The new SQL statements initially run with the plans that are known to produce good performance

    under standard test configuration.

    D. The optimizer does not generate new plans for the SQL statements for which the SQL plan baseline

    has been imported.

    Answer: AC

    答案解析:

    参考:http://blog.csdn.net/rlhua/article/details/16369811



    当部署一个新的应用模块时,软件供应商与用于被引入的新SQL的适当的SQL计划基线一起运送应用软件。哪两个语句描述了后果? 

    A, 计划基线可以随着时间的推移演变,产生更好的性能。

    C,新的SQL语句最初与计划一起运行,该计划在标准测试配置下已知能产生良好的性能。



     新应用程序部署:部署新的应用程序模块意味着在系统中引入新的 SQL 语句。软件供应商可以将应用程序软件与新引入的SQL 语句的相应SQL 计划基线一起提供。由于存在计划基线,新的SQL 语句最初将与已知在标准测试配置下具有良好性能的计划一起运行。但是,如果客户系统配置与测试配置有很大的差异,则计划基线可随时间演化以产生更好的性能。

  • 相关阅读:
    使用httperrequest,模拟发送及接收Json请求
    VI/VIM 常用命令
    Robot Framework开发系统关键字详细
    Python logging模块使用记录
    反编译app方法
    python+appium使用记录
    查看apk包及Activity名方法
    Robot Framework使用技巧
    git 常用使用及问题记录
    多个git账户生成多份rsa秘钥实现多个账户同时使用配置
  • 原文地址:https://www.cnblogs.com/hzcya1995/p/13316340.html
Copyright © 2020-2023  润新知