• 团队项目讨论及计划修订版


    项目选题:

    电梯调度算法的实现和测试

    项目背景:

    Imagine we’re building a tall office building, it has the following configuration about elevators:

    Building has 21 floors, 4 elevators, many passengers use these elevators everyday (passenger weight: average 70kg. max 120kg, min 45kg).

    Other constant data: Elevator speed, door open/close time, passenger time for going in/out of the elevator.  We can make reasonable assumptions about these.

    The building has 21 floors, from floor 0, 1, ... to 20.  Floor 0 is the underground parking level, floor 1 is the lobby level. Most people come in/out the building via these 2 floors.

     

    Elevator name

    Service floor list

    Passenger limit

    Weight limit

    1

    1, 10-20

    12

    1000 kg

    2

    0-10

    10

    1000 kg

    3

    1, 10-20

    20

    1500 kg

    4

    0-20

    20

    2000 kg

    需求分析:

    功能需求

    1、四台电梯同时工作

    2、随机在各楼层生成乘客信息

    3、开始工作后不能有乘客无法抵达目的楼层

    4、生成并记录个乘客抵达目的地的总用时

    性能需求

    1、具有高可靠性和容错能力

    2、具有安全检查机制

     

     项目目标:

    1、程序模块化设计

    2、记录每个人的总路程时间

    3、完成测试

    UML图

    将本次实验对象确定为电梯,乘客,楼层

    因为有大量的相关多个对象操作,所以也可以将操作设为一个对象类

    这样分类后,各物体类中只存在类的属性和检索类的数据的方法,将修改数据的操作都放在操作类内,这样分类后产生的UML图如下:

     

     

    时间及任务划分:

    第一周:设计大致模块。

    第二周:每人进行相关知识的学习,并讨论细化程序。

    第三至五周:分工完成程序。

    第六至七周:测试并优化程序,根据情况增加相应功能模块。

    第八周:进行最后微调并检查。

  • 相关阅读:
    Django笔记&教程 2-2 URL详细匹配规则
    Django笔记&教程 2-3 视图(view)函数介绍
    前端基础之HTML
    Python基础之(并发编程)
    Git常用命令
    Python基础之(Socket编程)
    Python基础之(异常与开发规范)
    Python基础之(面向对象进阶)
    Python基础之(面向对象初识)
    Python基础之(常用模块)
  • 原文地址:https://www.cnblogs.com/djzu/p/5401848.html
Copyright © 2020-2023  润新知