• 7.1.8 Assignments


    Assignments

    Time Limit: 4000/2000 MS (Java/Others) Memory Limit: 32768/32768 K (Java/Others)
    Total Submission(s): 48 Accepted Submission(s): 35

    Problem Description
    In a factory, there are N workers to finish two types of tasks (A and B). Each type has N tasks. Each task of type A needs xi time to finish, and each task of type B needs yj time to finish, now, you, as the boss of the factory, need to make an assignment, which makes sure that every worker could get two tasks, one in type A and one in type B, and, what's more, every worker should have task to work with and every task has to be assigned. However, you need to pay extra money to workers who work over the standard working hours, according to the company's rule. The calculation method is described as follow: if someone’ working hour t is more than the standard working hour T, you should pay t-T to him. As a thrifty boss, you want know the minimum total of overtime pay.
     

    Input
    There are multiple test cases, in each test case there are 3 lines. First line there are two positive Integers, N (N<=1000) and T (T<=1000), indicating N workers, N task-A and N task-B, standard working hour T. Each of the next two lines has N positive Integers; the first line indicates the needed time for task A1, A2…An (Ai<=1000), and the second line is for B1, B2…Bn (Bi<=1000).
     

    Output
    For each test case output the minimum Overtime wages by an integer in one line.
     

    Sample Input
    2 5
    4 2
    3 5
     

    Sample Output
    4

    思路:没做这道题,要NOI了,这道题不属于计算几何,赶紧做下一章数论算了

    http://fszxwfy.blog.163.com/blog/static/440193082013217112838338/

  • 相关阅读:
    jdk-8u271-windows-x64
    wps 2019 专业版最新激活密匙
    未分页内存泄露
    Nonpaged Pool(未分页池)占用内存过多分析定位
    python异常处理
    如何开发在线考试系统
    kvm学习
    MySQL安全审计-等保2.0
    Linux下启动/关闭Oracle
    rocketmq systemctl 启动
  • 原文地址:https://www.cnblogs.com/cssystem/p/3188730.html
Copyright © 2020-2023  润新知