• MOSS项目开发(1) 项目计划,重点及文档


    以下计划,重点及文档并不具有典型性。只是为自己留一份备份

    五个阶段:

    1. Requirements Definition (需求分析)
    2. System Design and Setup (系统设计)
    3. System Implementation (项目执行)
    4. User Acceptance Test (验收测试)
    5. Training and Documentation (培训及文档)


     

    Requirements Definition (需求分析)

    ·         Confirm on project execution plan (确定项目执行计划)

    ·         Confirm detailed functional specifications (确定性能规格书)

    ·         Develop interface design (用户界面开发)

    ·         Develop test strategy (测试策略开发)

    ·         Confirm database migration strategy (确定数据库迁移策略)

    ·         Confirm Security, ext. System integration and other infrastructure consideration (确定安全,系统集成等事项)

     

    ü  Project Execution plan (项目执行计划)

    ü  Project Plan (项目计划)

    ü  Detailed functional specifications (性能规格书)

    ü  System interface design (系统界面规格书))

    ü  Data and Web Content Conversion Documentation (数据转换文档)

    ü  System Configuration Documentation (系统配置文档)

    ü  Cut Over Plan (迁移计划)

     

     

     

     

    System Design and Setup (系统设计)

    ·         Confirm database design and application flow (确定数据库及程序流程)

    ·         Develop deployment plan (部署计划开发)

    ·         Setup server configuration (服务器配置)

    ·         Infrastructure setup (基础配置)

    ·         Confirm office 2007 Template Design/Workflow (确定MOSS2007模板及流程)

     

    ü  Detail design specifications (详细设计规格书)

    ü  System Design Documentation(系统设计文档)

    ü  Security Documentation (安全文档)

    ü  Interface Documentation (界面文档)

     

    System Implementation (项目执行)

    ·         Design Core Program / Common Library (核心程序/公共库设计)

    ·         Design XSLT for UI (为用户界面设计XSLT)

    ·         MOSS 2007 Template/Workflow Implementation and configuration

    (MOSS2007模板/流程开发和配置)

    ·         Application system Implementation and configuration

    (系统开发和配置)

    ·         Unit and system Integration testing

    (单体和系统测试)

    ·         Testing Inclusive of external system

    (整体环境测试)

    ·         System Integration

    (系统集成)

    ·         Content Migration

    (内容数据搬迁)

    ü  Unit and system Integration testing results (单体和系统集成测试结果)

    ü  User Manual draft (用户手册草稿)

    ü  Program Documentation (源码文档化)

     

    User Acceptance Test (验收测试)

    ·         Execute test plan (完成测试计划)

    ·         User acceptance test (UAT) (验收测试)

     

    ü  Test Script (测试脚本)

    ü  User Test Signoff (用户测试验收)

    ü  Finalize User Manual (用户手册完稿)

    ü  Procedure /Operations Manual (操作指南/手册)

    ü  Disaster Recovery Documentation (应急文档)

    ü  Training Plan (培训计划)

     

     

    Training and Documentation (培训及文档)

    ·         Develop training plan and set training environment (开发培训/培训环境设制)

    ·         Conduct training session (培训课程)

    ·         Prepare manual and technical documentation (准备所有手册/技术文档)

    ·         Data migration and go-live preparation (数据搬迁和准备go-live)

     

    ü  Training Plans and materials (培训计划和资料)

    ü  Manual and technical documentation (所有手册/技术文档)

    ü  Go-Live checklist and handover documentation (go-live检查清单和文档移交)

  • 相关阅读:
    信息系统项目管理师沟通的四个好习惯
    Android 线程
    替换exe程序图标DLL
    Python 邮件类
    android自适应屏幕方向和大小
    sqlserver 存储过程
    FinalData 数据恢复工具[绿色版]
    Python Python 正则 取中括号值
    在Button任意位置加图片效果
    android GPRS
  • 原文地址:https://www.cnblogs.com/by1455/p/803177.html
Copyright © 2020-2023  润新知