• Flexpod的开关机顺序


    Flexpod = Cisco UCS + Cisco Nexus + Netapp (中文名叫做“融合基础架构”)

    之前没有接触过这套系统,不太明白怎么个开关机的顺序,借公司停电的机会实际演练了一番:

    Power-Off:

    1.            Shutdown virtual machines in vCenter

    2.            Shutdown hypervisor hosts in vCenter

    3.            Go into UCS Manager, then click ‘Shutdown Servers’ to power off each blade

    4.            SSH into each Netapp controller, run 'cifs session *' & 'cifs terminate -t 0' to close the CIFS connection

    5.            Run 'cf status' & 'cf disable' to disable cluster

    6.            Run ‘halt -f -t 0’ to shutdown the controller graceful

    7.            Physical power off the storage controller

    8.            Physical power off all of the disk shelves

    9.            Unplug power cable from Fabric Interconnects

    Power-On:

    1.            Plug power cable to Fabric Interconnect, wait for minutes

    2.            Physical power on all of the disk shelves, wait for minutes

    3.            Physical power on the storage controller, wait for minutes

    4.            Run 'cf enable' & 'cf status' to enable cluster

    5.            Go into UCS Manager, then click ‘Boot Servers’ to turn on each blade

    6.            Power on virtual machines in vCenter

    官方知识库:https://kb.netapp.com/support/s/article/ka21A0000000b3FQAQ/what-is-the-procedure-for-graceful-shutdown-and-power-up-of-a-storage-system-during-scheduled-power-outage?language=en_US

  • 相关阅读:
    安装python包的两种方法
    Oracle 查询当前用户下的所有表
    Oracle SQL存储过程结构、异常处理示例
    Oracle IF-ELSE条件判断结构
    Oracle 组函数count()
    从svn下载项目后出现 Error:java: Compilation failed: internaljava compiler error 解决办法
    当学习失去方向,开始荒废时光时
    给自己一个目标
    汇编环境搭建在Linux下
    汇编学习总结
  • 原文地址:https://www.cnblogs.com/IvanChen/p/6823489.html
Copyright © 2020-2023  润新知